Ops Day Shift: 16:00-23:59UTC (08:00-3:59PT)
State of H1: PSL is down, hardware, software, and channel name changes made today
Activities today - general:
-
code changes
-
DAC restarts
-
Beckoff code changes
-
Beckoff reboots
-
model updates
-
channel name changes
-
hardware changes
Activities - details:
-
Bubba-Chris LVEA 3IFO racks
-
Fil LVEA BSC1/3 temp sensors
-
Nutsinee LVEA TCSY trip
-
Jim EY & EX ISI
-
Bubba-Chris check 3IFO racks
-
Bubba LVEA - crane floor cleaner over beam tube
-
Richard-Filiber to LVEA VAC - Beckoff LX
-
Rich-Jim EY BRS
-
Stefan ECR ITMs and BS measurements
-
Fil-Ed EY-EX pull cables
-
Keita PopX HAM1 ISCT1, and HAM6 OMC
Currently working on site, as of 4PM PT:
-
Stefan - coil driver measurements at EY and then EX
-
DaveB - at EX working on a frontend that didn't come back from reboots
as of 5PM PT: