H1 PSL
oliver.puncken@LIGO.ORG - posted 20:57, Wednesday 25 April 2012 (2703)
Disassembly of the PSL (Part 3)
PSL installation team

The new diode rack is now prepared to be packed. Also, the laser diode boxes and power  supplies are moved out of the old rack, but still stored in the LVEA. The pump light fibers / communication fibers had been pulled from the H1 LDR and the H1 LAE. The spools are stored on the rail inside the LDR (see attached picture).
Images attached to this report