Displaying report 1-1 of 1.
Reports until 16:23, Thursday 05 May 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 16:23, Thursday 05 May 2016 (27033)
Ops Day Shift Summary

All time in UTC

13:47 Chris S. working on beam tube enclosure sealing. Approx. be locateed 1/4 to 1/2 way toward Mid-X. Morning work.

15:19 Christina to LVEA

15:51 Jason heading to PSL

16:10 Joe to LVEA

16:15 Cheryl making measurement on IMs.

17:07 Hugh and Jim to EX.

17:21 Ed to LVEA

17:37 Ed back

17:40 Travis to LVEA to the racks near HAM2,3.

17:53 Manny to End stations looking for extension cords.

17:56 Joe out

18:13 Dave restarted LSC, ISC model

18:17 Hugh to LVEA retrieving equipment near HAM2.

18:24 Jenne and David start cutting floors in the LVEA

18:31 Hugh out

18:51 Hugh to EY making some measurement

18:57 Jason and Peter out for lunch

19:04 DAC restart (EX)

19:54 DAC restart (PEM EX)

20:23 Manny out

20:46 Manny to LVEA

21:06 Fil removing electronics box from ISCT1.

           Richard and Gerado to LX and beer garden look at VAC channels. BSC7 and BSC8  high pressure alarms were their doing.

21:25 Chris to EX to unload pile of lumber.

21:47 DAC and SUS ETMY model restart

22:30 Fil out

22:40 Peter and a group of operators to LVEA for Transition training.

23:00 Peter et al out.

Keita to ISCT1 sometimes between 22:00-23:00

 

NOTE TO ALL: MUST LET OPERATOR KNOW IF YOU ARE GOING TO END STATIONS. You are potentially causing BRS to ring up just by being there. If couldn't find operator on shift, let Jim know.

Displaying report 1-1 of 1.