jeffrey.bartlett@LIGO.ORG - posted 16:03, Monday 09 May 2016 (27075)
Ops Day Shift Summary
Transition Summary:

Title:  05/09/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
State of H1: IFO unlocked. Work on PSL is ongoing  
Commissioning: 
Outgoing Operator: N/A
 
Activity Log: All Times in UTC (PT)

15:00 (08:00) – Start of shift
16:22 (09:22) Peter – Going into PSL to pull inner loop photodiode box (WP #5872)
16:25 (09:25) Kyle – In the LVEA working on RGA
16:40 (09:40) Jason – Going into the H1 PSL enclosure
16:45 (09:45) Kyle – Craning leak detector over the X-Beam manifold
16:57 (09:57) Kyle – Finished craning in LVEA
17:00 (10:00) Bubba – Filling the water tank in the End-Y compressor room
17:20 (10:20) Open gate for people coming to see Ed for Mercury transit
18:00 (11:00) Bubba – Back from End-Y
19:50 (12:50) Jason & Peter – Out of PSL
20:00 (13:00) Dale – High school tour of control room
20:25 (13:25) Corey – Going into Optics Lab
20:45 (13:45) Dave – DAQ restart
20:50 (13:50) Sheila & Jeff – Reset ALS fiber polarization for X and Y
21:45 (14:45) Kyle – Going into the LVEA to check RGA temperatures
22:01 (15:01) Kyle – Out of the LVEA
22:10 (15:10) Peter – Going into the H1 PSL enclosure
22:38 (15:38) Kyle – Going into LVEA to check RGA temperatures
22:45 (15:45) Jason – Going into the H1 PSL enclosure
 
End of Shift Summary:

Title: 05/09/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: 
Incoming Operator: Cheryl 

Shift Detail Summary: Work continues on the PSL and vacuum system. Other groups taking advantage of this time to make updates and upgrades. 