Reports until 15:38, Wednesday 11 May 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:38, Wednesday 11 May 2016 (27124)
Ops Day Shift Summary

Title:  05/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
State of H1: IFO unlocked.  
Commissioning: 
Outgoing Operator: N/A
 
Activity Log: All Times in UTC (PT)

15:00 (08:00) Start of shift
15:30 (08:30) Peter – Working in the PSL 
16:02 (09:02) Betsy – Going to End-Y to turn on ESD high power
16:03 (09:03) Joe – Going to End-Y for inventory checks
16:15 (09:15) Jason – Going into the PSL
16:20 (09:20) Betsy – Back from End-Y
16:48 (09:48) Joe – Back from End-Y
16:50 (09:50) Joe – Going into the LAVE for inventory checks
17:07 (10:07) Joe – Out of the LVEA
17:45 (10:45) Jason & Peter – Out of the PSL
17:50 (10:50) Joe – Moving pumps from Mechanical building
18:00 (11:00) Kyle – Going into LVEA vertex to check RGA
18:07 (11:07) Peter & Jason – Working in the PSL
18:15 (11:15) Chandra – Going to both end stations to get parts and tools
18:20 (11:20) Joe – Out of the LVEA
18:20 (11:20) Kyle – Out of the LVEA
18:50 (11:50) Corey – Going into the Squeezer Bay 
19:11 (12:11) Chandra – Back from end stations
20:09 (13:09) Kyle – Going into LVEA to turn off RGA heat
20:14 (13:14) Kyle – Out of the LVEA
20:16 (13:16) Take IFO to DRMI_LOCKED for Sheila
21:42 (14:42) IFO down for PSL work
21:55 (14:55) Dave – Restarting the OMC PI model
21:57 (14:57) Filiberto – Going into the LVEA to check IO table panels
22:00 (15:00) Jason & Peter – In the PSL enclosure working on the ISS 
 
End of Shift Summary:

Title: 05/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: Sheila, Jenne, Dave, Jim
Incoming Operator: Cheryl 

Shift Detail Summary: Work continues on recovery of the PSL. Commissioning work during the day as the PSL work allowed. Turn over early to Cheryl, to make an appointment in town.