Title: 05/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) State of H1: IFO unlocked. Commissioning: Outgoing Operator: N/A Activity Log: All Times in UTC (PT) 15:00 (08:00) Start of shift 15:30 (08:30) Peter – Working in the PSL 16:02 (09:02) Betsy – Going to End-Y to turn on ESD high power 16:03 (09:03) Joe – Going to End-Y for inventory checks 16:15 (09:15) Jason – Going into the PSL 16:20 (09:20) Betsy – Back from End-Y 16:48 (09:48) Joe – Back from End-Y 16:50 (09:50) Joe – Going into the LAVE for inventory checks 17:07 (10:07) Joe – Out of the LVEA 17:45 (10:45) Jason & Peter – Out of the PSL 17:50 (10:50) Joe – Moving pumps from Mechanical building 18:00 (11:00) Kyle – Going into LVEA vertex to check RGA 18:07 (11:07) Peter & Jason – Working in the PSL 18:15 (11:15) Chandra – Going to both end stations to get parts and tools 18:20 (11:20) Joe – Out of the LVEA 18:20 (11:20) Kyle – Out of the LVEA 18:50 (11:50) Corey – Going into the Squeezer Bay 19:11 (12:11) Chandra – Back from end stations 20:09 (13:09) Kyle – Going into LVEA to turn off RGA heat 20:14 (13:14) Kyle – Out of the LVEA 20:16 (13:16) Take IFO to DRMI_LOCKED for Sheila 21:42 (14:42) IFO down for PSL work 21:55 (14:55) Dave – Restarting the OMC PI model 21:57 (14:57) Filiberto – Going into the LVEA to check IO table panels 22:00 (15:00) Jason & Peter – In the PSL enclosure working on the ISS End of Shift Summary: Title: 05/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) Support: Sheila, Jenne, Dave, Jim Incoming Operator: Cheryl Shift Detail Summary: Work continues on recovery of the PSL. Commissioning work during the day as the PSL work allowed. Turn over early to Cheryl, to make an appointment in town.