corey.gray@LIGO.ORG - posted 10:08, Friday 13 May 2016 (27169)
H1 Morning Status

H1 was available for commissioning this morning, and had tried to attempt locking, but had issues with the FSS (as noted by Kiwamu below).

Current H1 tasks:

  1. DBB work on PSL (but other work could continue)
  2. PSL Rotation Stage (Nutsinee) on the order of 45min
  3. ISS High Power tests after Nutsinee measurement
  4. --->H1 tripped off around 9:45 & Jason is currently working on bringing it back.  Once the PSL is back, DBB & Rotation Stage work will be on deck again.

Note:  SEI would like to have a locked H1 (DC Readout?) for some measurements at some point.