H1 was available for commissioning this morning, and had tried to attempt locking, but had issues with the FSS (as noted by Kiwamu below).
Current H1 tasks:
-
DBB work on PSL (but other work could continue)
-
PSL Rotation Stage (Nutsinee) on the order of 45min
-
ISS High Power tests after Nutsinee measurement
-
--->H1 tripped off around 9:45 & Jason is currently working on bringing it back. Once the PSL is back, DBB & Rotation Stage work will be on deck again.
Note: SEI would like to have a locked H1 (DC Readout?) for some measurements at some point.