Morning locking thwarted by a variety of issues:
15:00 EY 300NM Dust alarm sounding
15:27 Set Observatory Mode to Commissioning - IFO down haven't started aligning yet. Seemed to be the only viable option.
15:30 Monday meeting
16:07 John called about chiller issue at EY. He and Bubba are going to investigate.
16:27 Chandra out to investigate a RED condition on a diagonal annulus pump.
16:45 Peter and Jason into Ooptics lab
16:50 Karen and Chriatina to EX to put out mousetraps
17:30 Cheryl into optics lab
18:46 Dave and Jim re-starting the gateway between Guardian and Beckhoff in an attempt to resolve mysterious connection errors in the X-Arm.
19:01 turned of gateway and restarted guardian machine.
19:22 Dave will power cycle the guardian macine
19:44 Cheryl out of the optics lab
20:04 Patrick restarted the H1ECATX1 IOC and this seems to have resolved the guardian woes of the day.
20:50 Gamma Ray Burst - IFO in higher stages of lock acquisition.
21:03 Ken to MY to do some wiring
21:30 Bubba out to repair instrument air at EY chiller yard
22:03 Ken back
22:11 DAQ restart
22:30 Bubba back from EY chiller yard