Reports until 15:53, Tuesday 17 May 2016
H1 General
edmond.merilh@LIGO.ORG - posted 15:53, Tuesday 17 May 2016 (27253)
Shift Summary - Day
TITLE: 05/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:
LOG:

5:00 Ken into LVEA or grounding work

15:02 ACE on site to service Port-A Potties

15:11 LN2 delivery t0 8514372 (Y Mid)

15:25 Gerardo to LVEA

15:35 Richard done at EX and headed to EY

15:46 Gerardo out of the LVEA

15:46 Gerardo goin to MX

16:10 Manny and Leslie into LVEA 

16:15 Joe into the LVEA

16:19 Jason into PSL enclosure

16:24 Mitchell into optics lab or a few minutes and then into LVEA

16:31 Joe out of the LVEA

16:36 Corey out to LVEA to cover hole in ISCT6

16:55 Mitchell out of LVEA and heading to nd Stations

16:58 Manny out to LVEA to install a CAT6 cable between HAM 4/5

16:59 Travis back from ends

17:20 Hugh to out buildings to check HEPI fluid levels. Notgoing into VEA

17:24 Corey out to end stations to patch "light" hole in ISC tables.

17:40 Karen ad Christina out to end stations

17:43 Brought HAMs 2,3,4,and 5 to offline for Jeff to restart he HSTS models

18:10 Corey and Hugh headed back from EY. Finished at both ends.

18:17 Joe back from LVEA

18:18 DAQ restart

18:21 Jeff running charge measurements

18:25 Ken out to EX to do grounding

18:29 Sheila and Haocun going into optics lab and then to ISCT1

18:29 Karen out of EY

19:03 Christina back from EX

19:04 Ken back from EX and headed to EY

19:30 Ken finished

20:05 Bubba and John out to LVEA

20:20 Bubba and John out