Reports until 23:05, Tuesday 17 May 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 23:05, Tuesday 17 May 2016 (27264)
Ops Evening Shift Report
Title:  05/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
State of H1: IFO locked at DC_READOUT with 2w of power.   
Commissioning: Several commissioning tasks underway.
Outgoing Operator: Ed
 
Activity Log: All Times in UTC (PT)

23:00 (16:00) Start of shift
23:45 (16:45) Sheila & Haocun – Going to IOTC1
00:10 (17:10) Sheila & Haocun – Out of LVEA
01:01 (18:01) Sheila & Haocun – Going to IOTC1 
01:43 (18:43) Sheila & Haocun – Out of the LVEA
01:46 (18:46) Sheila & Haocun – Going to IOTC1
02:18 (19:18) Sheila & Haocun – Out of LVEA
02:25 (19:25) Sheila & Haocun – Going to IOTC1
02:53 (19:53) Sheila & Haocun – Out of LVEA
03:17 (20:17) Sheila & Haocun – Going to IOTC1 
03:22 (20:22) Sheila & Haocun – out of LVEA
05:19 (22:19 Lost Lock – PSL down with Crystal Chiller flow sensor error


End of Shift Summary:

Title: 05/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
Support: Jenne, Sheila, Haocun, Evan
Incoming Operator: N/A 

Shift Detail Summary: IFO has been mostly locked at various stages during the evening shift while commissioning work ongoing. At 05:19 (22:19) Lost Lock due to flow sensor error on PSL Crystal Chiller. Commissioners going home for the night.