Reports until 10:51, Wednesday 18 May 2016
H1 ISC
corey.gray@LIGO.ORG - posted 10:51, Wednesday 18 May 2016 - last comment - 11:51, Wednesday 18 May 2016(27274)
ISC Table Work: ISCT1 PZT Driver Moved & Enclosure Holes Covered

ISCT1 Mad City Labs (MCL) PZT Driver (for POP AIR) Moved 

This Driver was on the south (crane coordinates) end of enclosure roof.  It was moved to the north side.  This required making a new Power cable (Thanks Manny/Fil) & barrel-ed some BNC extensions to the BNC.  I did not touch the DB9 cables, but they are labeled and dangling out of the south wall for now.

Covering ISC/IO Enclosure Holes (this was done yesterday)

Peter K asked me to cover some small holes on the ISCT6 Enclosure.  I went ahead and checked all the enclosures and covered holes with foil tape to the best of my abilities (so some roof panels and some chamber-side panels might have been passed over, but as noted, these are small holes.)

Comments related to this report
daniel.sigg@LIGO.ORG - 11:51, Wednesday 18 May 2016 (27276)

Drawing D1201499-v3 updated to reflect this change.