edmond.merilh@LIGO.ORG - posted 15:55, Wednesday 18 May 2016 (27281)
Shift Summary - Day
TITLE: 05/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:
Half the day spent waiting for ringdown of 6.8mag quake near Ecuador. Locked at DC readout at 21:37. Sheila working on PRC broke lock. Re-Locked at DC readout at 22:38.
 
LOG:

15:28 Manny down to EY

15:54 Manny back to corner

16:01 Apollo contracter working at MX

16:04 Corey out to ISCT1 to move some electronics

16:07 Manny to MY

16:15 Travis out to End Stations

16:31 Jim B restarting the ASC model and a DAQ restart to follow.

16:34 DAQ recovered

16:45 Travis back from EY

16:53 PLATT on site

17:04 ITMX watchdog tripped. The culprit: another 6.8mag quake in the Ecuador area

17:09 Nutsinee out to LVEA to checkk on TCSX connections for possible noise mitigation

17:30 Corey was out of the LVEA but he's going back in with a cable he found and then he's into the optics lab shortly thereafter

18:27 Jim B and Dave goin out to end stations.

18:49 Karen and Christina out to MY

19:20 Jim and Dave back

20:07 Karen and Christina to MX

20:42 Karen and Christina leaving MX

20:44 Hugh and Dave into CER to retrieve 785

20:53 Hugh and Dave out of CER

22:00 Safety Meeting

22:45 Gerardo to MY to steal some LN2

 