15:28 Manny down to EY
15:54 Manny back to corner
16:01 Apollo contracter working at MX
16:04 Corey out to ISCT1 to move some electronics
16:07 Manny to MY
16:15 Travis out to End Stations
16:31 Jim B restarting the ASC model and a DAQ restart to follow.
16:34 DAQ recovered
16:45 Travis back from EY
16:53 PLATT on site
17:04 ITMX watchdog tripped. The culprit: another 6.8mag quake in the Ecuador area
17:09 Nutsinee out to LVEA to checkk on TCSX connections for possible noise mitigation
17:30 Corey was out of the LVEA but he's going back in with a cable he found and then he's into the optics lab shortly thereafter
18:27 Jim B and Dave goin out to end stations.
18:49 Karen and Christina out to MY
19:20 Jim and Dave back
20:07 Karen and Christina to MX
20:42 Karen and Christina leaving MX
20:44 Hugh and Dave into CER to retrieve 785
20:53 Hugh and Dave out of CER
22:00 Safety Meeting
22:45 Gerardo to MY to steal some LN2