(Corey, Doug, Jodi, Kyle, Mitchell, Travis) Once BSC6 was vented and the door was removed (around 2:30-ish?), the crew started with removal of ETMy. This involved: o Much staging o Taking contamination sample of chamber o Setting ETMy on earthquake stops (with teflon on tips of stops) o Installing LOS Installation fixturing o Removing ETMy o Removing part of the ETMy telescope Tomorrow, we will remove the rest of the Telescope and the hockey puck weights.