TITLE: 5/19 EVE Shift: 23:00-07:00UTC (16:00-00:00PDT), all times posted in UTC
STATE of H1: POP AIR PD swap was going on (Evan)
Outgoing Operator: TJ
Quick Summary:
Evan was on the floor working on swapping POP PDs out at ISCT1. While out there, HAM2 ISI (& mirrors) and HAM5 ISI (&SRM) tripped. Brought these back and H1 taken to DRMI for POP work by Evan.
Evan will continue some tweaks & Ross would like to run some ETMx ESD resonance measurements. Will take H1 to Nominal Low Noise (which currently takes laser power to 25W.
Observatory Mode was at Planned Engineering.
Environment: useism trending down & winds are under 10mph.