TITLE: 05/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Corey
SHIFT SUMMARY: A few earthquakes prevented locking for a some hours, but Jim got some SEI testing in and commissioners are doing their thing now.
LOG:
-
16:37 - Richard to MY.
-
16:42 - Gerardo to LVEA to check on ion pump.
-
17:09 - Gerardo out.
-
19:40 - Sheila, Evan H, Hoacun to LVEA near HAM6.
-
19:52 - Keita, Kiwamu to LVEA PSL racks.
-
20:31 - Keita, Kiwamu out.
-
21:34 - Kiwamu to LVEA PSL racks.
-
22:10 - Gerardo to CP3.
-
22:11 -Sheila to LVEA PSL rack.
-
22:20 - Sheila out.
-
22:26 - Gerardo back.
-
22:46 - Kiwamu to LVEA.