Displaying report 1-1 of 1.
Reports until 16:03, Monday 23 May 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:03, Monday 23 May 2016 (27337)
Shift Summary - Eve Transition
TITLE: 05/23 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Jim
CURRENT ENVIRONMENT:
    Wind: 16mph Gusts, 7mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.09 μm/s 
QUICK SUMMARY:
Displaying report 1-1 of 1.