J. Oberling, T. Schaffer
The PR3 and SR3 oplevs have been moved from the stand-alone DC power supplies on loan from the EE shop to a power supply installed in the LVEA CER. Both lasers came back up without issue but will need a few hours to thermally stabilize again, as we had to open the coolers to turn them off and on. This completes work permit #5895.