1. Ran field cables for the ITM ESD install. This required working on top of HAM3 to dress cables. Cables in the CER were dressed into SUS-C6.
2. Installed railing and shelves for the high voltage ESD supplies (CER Mezzanine)
3. Ken ( K Electric) ran power cable from CER Mezzanine to the SUS racks in the beer garden
4. Started installation of NGN electronics in CER Rack OAF-C1
5. Looked at power distribution for the Op Lever in LVEA. Power supply in CER was powered on, and began testing drop off points on the floor, correct voltage output.