Reports until 16:11, Thursday 26 May 2016
LHO General
patrick.thomas@LIGO.ORG - posted 16:11, Thursday 26 May 2016 (27411)
Ops Day Summary
Peter in PSL enclosure
14:55 UTC Jeff B. moving chiller with forklift
15:13 UTC Lock loss after sitting on LOCK_ALS. A short time after the ISI ITMX stage 1 and 2 watchdogs tripped.
15:23 UTC Filiberto to beer garden to take measurements for running cables
15:33 UTC Jeff B. done
15:43 UTC Filiberto done
15:56 UTC Peter to LVEA to toggle NPRO noise eater switch
16:00 UTC Peter back
16:12 UTC Peter to PSL enclosure
17:10 UTC Fire department truck through gate
17:22 UTC Betsy looking for parts in LVEA west bay
17:35 UTC Jim W. to end X to install anemometer in desert (WP 5902)
17:32 UTC Peter done
17:44 UTC I toggled the NPRO noise eater switch
17:46 UTC Dave loading ASC filter modules
17:55 UTC Started attempting to lock
18:09 UTC Lock loss on CARM_5PM
18:28 UTC Lock loss on ENGAGE_ASC_PART2
18:47 UTC Re-requested READY_FOR_HANDOFF for OMC_LOCK node in order to get to DC_READOUT
The ISS first loop did not engage because the PSL AUTOLOCK was off. Kiwamu turned it on.
18:50 UTC Jim W. back
19:55 UTC Tour leaving control room
20:06 UTC Travis to end Y to reset camera
20:44 UTC Have been sitting at DC readout. Commissioners back. Evan H. changing 9Mhz modulation depth.
20:47 UTC Travis back
21:24 UTC Evan H. done
Going to NOISE_TUNINGS for Sheila and Terra to run measurements
Got stuck on increase power. Sheila changed guardian code to continue.
22:11 UTC Kiwamu and Nutsinee to CO2 Y table to remove beam block
22:15 UTC Jim W. to end X to retrieve anemometer from desert
22:44 UTC Kiwamu and Nutsinee back. They did not remove the beam dump.
22:47 UTC Jim W. back
22:53 UTC Kiwamu and Nutsinee back to CO2 Y table