Peter in PSL enclosure 14:55 UTC Jeff B. moving chiller with forklift 15:13 UTC Lock loss after sitting on LOCK_ALS. A short time after the ISI ITMX stage 1 and 2 watchdogs tripped. 15:23 UTC Filiberto to beer garden to take measurements for running cables 15:33 UTC Jeff B. done 15:43 UTC Filiberto done 15:56 UTC Peter to LVEA to toggle NPRO noise eater switch 16:00 UTC Peter back 16:12 UTC Peter to PSL enclosure 17:10 UTC Fire department truck through gate 17:22 UTC Betsy looking for parts in LVEA west bay 17:35 UTC Jim W. to end X to install anemometer in desert (WP 5902) 17:32 UTC Peter done 17:44 UTC I toggled the NPRO noise eater switch 17:46 UTC Dave loading ASC filter modules 17:55 UTC Started attempting to lock 18:09 UTC Lock loss on CARM_5PM 18:28 UTC Lock loss on ENGAGE_ASC_PART2 18:47 UTC Re-requested READY_FOR_HANDOFF for OMC_LOCK node in order to get to DC_READOUT The ISS first loop did not engage because the PSL AUTOLOCK was off. Kiwamu turned it on. 18:50 UTC Jim W. back 19:55 UTC Tour leaving control room 20:06 UTC Travis to end Y to reset camera 20:44 UTC Have been sitting at DC readout. Commissioners back. Evan H. changing 9Mhz modulation depth. 20:47 UTC Travis back 21:24 UTC Evan H. done Going to NOISE_TUNINGS for Sheila and Terra to run measurements Got stuck on increase power. Sheila changed guardian code to continue. 22:11 UTC Kiwamu and Nutsinee to CO2 Y table to remove beam block 22:15 UTC Jim W. to end X to retrieve anemometer from desert 22:44 UTC Kiwamu and Nutsinee back. They did not remove the beam dump. 22:47 UTC Jim W. back 22:53 UTC Kiwamu and Nutsinee back to CO2 Y table