Displaying report 1-1 of 1.
Reports until 02:49, Friday 27 May 2016
H1 ISC
terra.hardwick@LIGO.ORG - posted 02:49, Friday 27 May 2016 (27419)
Lock acquisition failing before ENGAGE_SRC_ASC

Over the past hour or two, locklosses (8) have all occured during transitions to ANALOG_CARM, DARM_OFFSET, or ENGAGE_SRC_ASC. Microseism and wind have been quiet. Leaving it in DOWN. 

I've turned the ETMX ring heater back on (requested power 0.5W top and bottom). 

Displaying report 1-1 of 1.