Displaying report 1-1 of 1.
Reports until 16:11, Friday 27 May 2016
LHO General
patrick.thomas@LIGO.ORG - posted 16:11, Friday 27 May 2016 (27431)
Ops Day Summary
13:55 UTC Chris S. opened high bay outside door for approx. 30 min to remove barrels
Mode cleaner lost lock, NPRO noise eater went out of range
15:22 UTC Jim W. to LVEA to toggle noise eater switch
15:28 UTC Jim W. done
15:55 UTC Betsy to LVEA to look for equipment
16:11 UTC Travis to HAM6 with tape measure
16:22 UTC Jim B. to staging building
16:28 UTC Travis and Betsy done
16:42 UTC Nutsinee and Kiwamu to TCSY CO2 table
17:02 UTC Jeff B. and Jason using forklift by mechanical room
17:32 UTC Jim B. back
17:55 UTC Keita and Haocun to HAM6 to take measurements
18:02 UTC Jeff B. and Jason done
18:09 UTC Kyle to LVEA to look for property tag
18:11 UTC Boom lift delivery through gate
18:55 UTC Kyle back. Kyle going to mid Y.
19:05 UTC Nutsinee and Kiwamu back
19:25 UTC Kyle back from mid Y
20:05 UTC Jeff B. using forklift near mechanical building
20:21 UTC Christina to open OSB receiving door
20:31 UTC Chandra and Gerardo to mid Y to fill CP3 and look at equipment in building
20:51 UTC Kiwamu and Nutsinee back to TCSY CO2 table
21:01 UTC Keita to CER to check ISC racks
21:13 UTC Jeff B. done
21:13 UTC Chandra and Gerardo done

Sheila and Evan H. have been troubleshooting locklosses. Nutsinee and Kiwamu have been working on TCSY CO2.
Displaying report 1-1 of 1.