13:55 UTC Chris S. opened high bay outside door for approx. 30 min to remove barrels Mode cleaner lost lock, NPRO noise eater went out of range 15:22 UTC Jim W. to LVEA to toggle noise eater switch 15:28 UTC Jim W. done 15:55 UTC Betsy to LVEA to look for equipment 16:11 UTC Travis to HAM6 with tape measure 16:22 UTC Jim B. to staging building 16:28 UTC Travis and Betsy done 16:42 UTC Nutsinee and Kiwamu to TCSY CO2 table 17:02 UTC Jeff B. and Jason using forklift by mechanical room 17:32 UTC Jim B. back 17:55 UTC Keita and Haocun to HAM6 to take measurements 18:02 UTC Jeff B. and Jason done 18:09 UTC Kyle to LVEA to look for property tag 18:11 UTC Boom lift delivery through gate 18:55 UTC Kyle back. Kyle going to mid Y. 19:05 UTC Nutsinee and Kiwamu back 19:25 UTC Kyle back from mid Y 20:05 UTC Jeff B. using forklift near mechanical building 20:21 UTC Christina to open OSB receiving door 20:31 UTC Chandra and Gerardo to mid Y to fill CP3 and look at equipment in building 20:51 UTC Kiwamu and Nutsinee back to TCSY CO2 table 21:01 UTC Keita to CER to check ISC racks 21:13 UTC Jeff B. done 21:13 UTC Chandra and Gerardo done Sheila and Evan H. have been troubleshooting locklosses. Nutsinee and Kiwamu have been working on TCSY CO2.