Reports until 12:41, Wednesday 02 May 2012
H2 SEI
hugh.radkins@LIGO.ORG - posted 12:41, Wednesday 02 May 2012 - last comment - 08:29, Thursday 03 May 2012(2744)
BSC6 ETMY Work & Status
GregG & HughR
Greg went in chamber and added the screws to the ISC Cables that had none.  These were reconnected and are now secure to the FeedThru.  These were the ISC Transmon 532nm & Beam Diverter cables.
Also, Greg connected the one still dangling cable to F3-3C2 (D1003085), presumably this is the TCS-Ring Heater cable.

Next we took some level shots on the Optical Table and saw +-0.2mm level.  We made some slight HEPI tweaks and using the dial indicators as a guide to what we did, we now have the level to +-0.1mm.  So this should be good.

We'll make the Actuator Connections next.
Comments related to this report
keita.kawabe@LIGO.ORG - 08:29, Thursday 03 May 2012 (2754)

Note my earlier alog entry.

https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=2586