Displaying report 1-1 of 1.
Reports until 13:06, Tuesday 31 May 2016
H1 CDS (DAQ)
david.barker@LIGO.ORG - posted 13:06, Tuesday 31 May 2016 (27453)
CDS maintenance summary

TCS Y-table FLIR camera

Kiwamu, Dave:

the TCS-Y infrared camera was not responding. Restarting the controller unit at the table appears to have resolved it.

h1nds1 restart

h1nds1 stopped running. Monit was not monitoring it, we manually instructed monit to restart daqd and it is running again.

h1oaf0 power cycle

Following three occurences of the TCS DAC being driven to zero volts, this morning we power cycled the IO Chassis for h1oaf0. Power was removed from the chassis using the front panel switch, it was down for about one minute. h1tcscs was manually burt restored to 09:10 PDT this morning.

roof camera

Richard, Jim, Dave:

We went onto the roof and verified the CDS AUX vlan was operational at the fiber media converter, it was.

Displaying report 1-1 of 1.