TITLE: 05/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jim
SHIFT SUMMARY: After PSL was brought back to life and maintenance activties subsided, we are having issues getting past DRMI locked.
LOG:
14:56 Ken to MY working on HVAC
15:06 Cristina and Karen to LVEA
15:35 Fil and Ed pulling cables in beer garden
15:43 Hugh to ends HEPI maint.
15:50 turned of BRS at both ends for maint. work
15:50 Gerardo and Manny to all VEAs, pulling extension cords in prep for power outage
16:12 Kiwamu working on TCS alignment
16:34 Hugh done
16:48 Nutsinee to TCS table
17:00 Karen to EY
17:05 Fil and Ed out
17:54 Fil working on ESD in beer garden
18:00 Gerardo and Manny back from ends, to LVEA
18:02 Jason to diode room
18:05 PSL back up
19:00 Kiwamu done
19:51 Fil to beer garden
20:21 Bubba to LVEA checking 3IFO N2 purge
21:07 Fil out
21:25 Kiwamu and Nutsinee to TCS table
22:27 turned BRS back on at both ends
22:39 Kiwamu and Nutsinee out