TITLE: 06/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Locked at ENGAGE_REFL_POP_WFS most of the day with Kiwamu and Rana doing commissioning work,
LOG:
15:54 Ken to MY HVAC work
15:59 Kiwamu to EX resetting RMS UL WD
16:26 Kiwamu back
16:41 Rich and Fil to LVEA ESD work
17:19 Gerardo to MY and MX
17:24 Richard and Ken to MY
19:08 Gerardo done
19:37 Richard and Ken done
19:54 Fil to LVEA beer garden
20:27 Rich to LVEA
21:19 Rich out