Activities:
-
Fire Dept on site, Richard talking to them
-
Fire System maintenance
-
Gerardo and Kyle will be visiting the site over the weekend to monitor the vacuum system
-
Bubba will be visiting the site this weekend to monitor generators
-
Prep for Monday, starts today at 3PM today (all activities except CDS, which starts at 4PM)
Currently:
-
Jim - ECR - installing hardware required for the ESD (readbacks)
-
Fil, Manny - LVEA working on ESD install at the vertex
-
Cheryl - TFs on ETMX and ETMY, L2 pitch/yaw to Oplev pitch/yaw
-
JeffK - charge measurements on ETMs
Work still planned for today:
-
Kiwamu - lock and work on damping violin modes
Tours:
-
three total today
-
Caltech and two schools
-
OSB front room needed for the Caltech group lunch
Moday timeline:
-
Essentail staff on site as usual
-
Hugh in early for HEPI fluid level checks (needs 2-3 hours)
-
Operators in at 9AM
-
Full recovery activities start at 9AM, however, consult Hugh about the state of HEPI
To be more clear regarding the HEPI task I will perform Monday morning, see WP 5910.
This is the Capacitive Accumulator Pressure checking which requires the HEPI Pumps off. This is done only every 3 to 6 months.