(Corey, Eric, Hugo)
HAM ISI #5
Hugo is running various measurements on the system. We moved a 10kg mass to every corner of table so time series could be recorded at different tip angles. (this is all to check the effects of a tipped table on the GS13s.
HAM ISI #6
Continued work on the Stage-0 Assembly. The Support Posts, & Gussets were installed. Stage-0 can now be moved to the Test Stand (and Stage-1 floor can then be moved to the Assembly stand). Background activity is that small parts were helicoiled.