(All time in UTC)
Quick Summary:
14:00 Chris S. to both end stations to retrieve generators
15:19 Fil + Alfredo to End stations to turn on facility related stuff
15:28 Hugh begins working on WP#5910
16:00 John et al. to LVEA
TJ + Richard to End stations to power up front end computers
Locking gate valves open (John, Chandra)
16:05 Switching from generators to site power
16:15 PSL, AUX online
Fil back
16:19 Chandra + John out
Corner station Beckhoff running
16:30 Chandra to MX, EX to plug in VAC system
16:34 Richard + TJ done with EX, going to MX, EY
16:41 Patrick restoring EPICS IOC h0epics2
16:49 epics gate way is up -- nds1 is wokring (Dave) -- It doesn't work by the way
17:00 Richard + TJ back
Richard + Jason turning on high voltage (CER upstairs)
17:09 CDS front end is ready to go
Guardian medm starts up
17:10 Jason + Ed recovering PSL
17:16 Nutsinee to mezzanine and LVEA to recover TCS CO2
All corner station high voltage is on
17:20 PCal EX recovery (Darkhan)
17:43 PCal EY recovery (Darkhan)
18:01 Corner station Dolphins are alive.
Hugh done at EX, heading to EY
18:10 EX ESD is good to go
18:15 Coner station HEPI pump is good (Jim)
DAC restart (Dave)
18:17 Power cycle Beckhoff chasis and PD amplifier (Fil)
18:22 TCS CO2 is ready and fired (NK)
18:26 Fil out of EY, heading to EX
18:42 Fil restarted EX End station 2 Beckhoff chasis
18:49 Hugh back from EY. Jim recovering HEPI pumps.
18:55 Richard to LVEA to reset PSL emergency stop.
Hugh and Jim to EY to restart BRS.
SEI is good to go
19:02 All SUS M0 DAMP P,Y are messed up. Rana recovered the setting. Diff accepted in safe.snap (FM1, FM2, FM5, FM6, FM8, FM10 gain = -1)
19:08 Rich + Terra to beer garden (ITMX ESD driver work)
19:22 BRS are up (Hugh+Jim)
19:34 Rich+Terra out
19:43 Terra to beer garden
19:49 Betsy to EX to powercycle EX PUM BIO I/O chasis
Terra out
20:00 Jeff B to EX > EY > LVEA
20:02 Fil reboot beckhoff chasis
20:13 Darkhan back. PCal Y not working
20:16 Betsy back
20:23 Rich + Daniel puttin chasis back (beer garden)
20:29 Chandra to Mid staions and End stations to install some plugs.
20:32 Jeff B out of EX, heading to EY
20:38 Fill and Patrick to EY (Beckhoff problem)
20:45 Hugh+Krishna+Michael to EY (BRS)
20:56 Jason+Ed out
21:02 JeffB out
21:05 Rich+Daniel out
21:16 Begin IMs alignment. Referencing values from alog26916.
21:35 Hugh+Krishna+Michael to EX (BRS)
21:36 Rich to beer garden (ESD electronics)
21:50 Jeff B to LVEA to obtain weekend temperature data
21:53 Chandra to BSC8 to take pictures of RGA.
22:03 Jeff B out.
22:06 Fil+Patrick back. EY Beckhoff is up and running.
22:20 All IMs are restored to their good values.
Jenne working on aligning MC optics.
22:32 Kyle to retrieve a piecec of electronics
22:39 Kyle back
21:55 Disable ESD to do PI measurement (Terra+Carl -- both end stations)
23:02 IFO_ALIGN slide bars put back in place. Referencing values from alog27557.