Displaying report 1-1 of 1.
Reports until 16:04, Monday 06 June 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 16:04, Monday 06 June 2016 (27582)
Ops Day Shift Summary

(All time in UTC)

Quick Summary:

14:00 Chris S. to both end stations to retrieve generators

15:19 Fil + Alfredo to End stations to turn on facility related stuff

15:28 Hugh begins working on WP#5910

16:00 John et al. to LVEA

          TJ + Richard to End stations to power up front end computers

         Locking gate valves open (John, Chandra)

16:05 Switching from generators to site power

16:15 PSL, AUX online

          Fil back

16:19 Chandra + John out

          Corner station Beckhoff running

16:30 Chandra to MX, EX to plug in VAC system

16:34 Richard + TJ done with EX, going to MX, EY

16:41 Patrick restoring EPICS IOC h0epics2

16:49 epics gate way is up -- nds1 is wokring (Dave) -- It doesn't work by the way

17:00 Richard + TJ back

          Richard + Jason turning on high voltage (CER upstairs)

17:09 CDS front end is ready to go

          Guardian medm starts up

17:10 Jason + Ed recovering PSL

17:16 Nutsinee to mezzanine and LVEA to recover TCS CO2

          All corner station high voltage is on

17:20 PCal EX recovery (Darkhan)

17:43 PCal EY recovery (Darkhan)

18:01 Corner station Dolphins are alive.

         Hugh done at EX, heading to EY

18:10 EX ESD is good to go

18:15 Coner station HEPI pump is good (Jim)

         DAC restart (Dave)

18:17 Power cycle Beckhoff chasis and PD amplifier (Fil)

18:22 TCS CO2 is ready and fired (NK)

18:26 Fil out of EY, heading to EX

18:42 Fil restarted EX End station 2 Beckhoff chasis

18:49 Hugh back from EY. Jim recovering HEPI pumps.

18:55 Richard to LVEA to reset PSL emergency stop.

          Hugh and Jim to EY to restart BRS.

          SEI is good to go

19:02 All SUS M0 DAMP P,Y are messed up. Rana recovered the setting. Diff accepted in safe.snap (FM1, FM2, FM5, FM6, FM8, FM10 gain = -1)

19:08 Rich + Terra to beer garden (ITMX ESD driver work)

19:22 BRS are up (Hugh+Jim)

19:34 Rich+Terra out

19:43 Terra to beer garden

19:49 Betsy to EX to powercycle EX PUM BIO I/O chasis

          Terra out

20:00 Jeff B to EX > EY > LVEA

20:02 Fil reboot beckhoff chasis

20:13 Darkhan back. PCal Y not working

20:16 Betsy back

20:23 Rich + Daniel puttin chasis back (beer garden)

20:29 Chandra to Mid staions and End stations to install some plugs.

20:32 Jeff B out of EX, heading to EY

20:38 Fill and Patrick to EY (Beckhoff problem)

20:45 Hugh+Krishna+Michael to EY (BRS)

20:56 Jason+Ed out

21:02 JeffB out

21:05 Rich+Daniel out

21:16 Begin IMs alignment. Referencing values from alog26916.

21:35 Hugh+Krishna+Michael to EX (BRS)

21:36 Rich to beer garden (ESD electronics)

21:50 Jeff B to LVEA to obtain weekend temperature data

21:53 Chandra to BSC8 to take pictures of RGA.

22:03 Jeff B out.

22:06 Fil+Patrick back. EY Beckhoff is up and running.

22:20 All IMs are restored to their good values.

          Jenne working on aligning MC optics.

22:32 Kyle to retrieve a piecec of electronics

22:39 Kyle back

21:55 Disable ESD to do PI measurement (Terra+Carl -- both end stations)

23:02 IFO_ALIGN slide bars put back in place. Referencing values from alog27557.