Displaying report 1-1 of 1.
Reports until 17:11, Monday 06 June 2016
H1 PEM (SEI, SUS)
vernon.sandberg@LIGO.ORG - posted 17:11, Monday 06 June 2016 (27588)
LVEA Temperatures 2016 June 3-6

Attached are the temperature and RH plots from the data logger inside the LVEA 3IFO Desiccant Cabinet during the outage. Being inside a closed cabinet with a continual nitrogen boil-off is not a true measurement of the LVEA temperature, but it should give an idea as to how the temperature changed over the weekend.

[from an email by Jeff Bartlett]

Images attached to this report
Non-image files attached to this report
Displaying report 1-1 of 1.