TITLE: 06/07 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY: Still recovering from power outage over the weekend. Got through Initial Alignment with only mild struggling. Digital video camera 18 connection error gave us grief during MICH_DARK locking (see screenshot). Also see screenshot of IFO Align for a starting place tomorrow as we expect the alignment to drift for some time due to thermalizing. DIAG_MAIN has been giving an error for H1:PEM-EX_WIND_ROOF_WEATHER_MPH all night.
LOG:
23:46 Darkhan to EY investigating PCal
0:34 Darkhan back, PCalY back up and running
1:40 Dave restarts camera script
2:00 Model restart for ITMx and ITMy for PI model changes