Reports until 20:52, Thursday 03 May 2012
LHO General
david.barker@LIGO.ORG - posted 20:52, Thursday 03 May 2012 (2761)
CDS computing work
Cyrus, Jim, Dave.

H2: installed the Hartmann sensor computer in the EY station on the H2 slow controls network. Changed the EPICS database from CIT to H2 channels, installed medm, connected fiber link to the ALS table in the VEA.

H1: Dan installed the H1 MSR QFS writer and its SATABOY raid system. Cyrus installed the fibre patch panels from MSR to H1EE_ROOM and installed the network switch in H1EE. Jim installed the h1boot file system, h1build, and the DAQ data concentrators.

FMCS network link to LSB was disrupted by an accidental hub power down. This was restored.