nutsinee.kijbunchoo@LIGO.ORG - posted 14:18, Tuesday 07 June 2016 - last comment - 16:02, Tuesday 07 June 2016(27626)
Ops Day Shift Summary

(All time in UTC)

14:57 Jeff K. running charge measurement both ETMs.

15:07 Joe to LVEA checking batteries on folk lifts and etc.

15:21 Gerado to MY. WP#5920

15:35 Fil+Ed to CER

15:43 Chris S. taking pest control to LVEA (~20 min)

15:48 HEPI weekly inspection at End stations (Hugh)

15:50 Ken installing lightbulbs in CER

15:52 Kristina+Karen to LVEA

16:07 Chris+Mich taking pest control to end stations

16:12 Joe out

16:21 Jason to PSL working on diagnostic breadboard

16:33 Nutsinee running CO2 RS script (~20 mins).

16:35 Ken open up the roll up door between high bay and LVEA to bring a lift through.

16:39 Fil to EX working on PUM chasis

17:09 Portable truck on site

17:29 Jeff B. to EX

17:35 Kyle to HAM10 (WP#5923)

          Ed installing Newtonian chasis in CER (TCS rack)

17:43 Joe to LVEA

17:48 Gerado to EX (WP#5922)

17:57 Kristina+Karen to End stations

         Carl+Ross+Terra to EY (PI ESD work)

18:02 Jeff B back

18:17 Chris+Mich out

18:25 Hugh back. HEPI Maintenance done.

         Joe back

18:50 Jason out

18:53 Karen leaving EY

18:55 Gerado out of EX

19:15 Kyle out

19:22 Kristina leaving EX

19:40 Terra+ out

          Fil to EX

19:44 Terra+ to EX

19:55 Dave restarting h1susb123 model and iop, ITM PI model, and DAQ

20:01 Ed to MX

20:04 Kyle to HAM10 (ion pump)

20:26 Gerado to LVEA

20:32 Fil back

20:34 Chris+Mich to LVEA (clean room inspection)

20:40 Gerado out

20:44 RIch to EX (ESD work)

20:55 Mich to LVEA

21:00 Mich out

21:11 Terra+ out

14:17 Jeff Bartlett is taking over until 4.

 

Comments related to this report
jeffrey.bartlett@LIGO.ORG - 16:02, Tuesday 07 June 2016 (27634)
Title:  06/18/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
State of H1: IFO unlocked. Recovering from the power outage & maintenance window
Commissioning: Commissioners working on IFO.
Outgoing Operator: Nutsinee 
 
Activity Log: All Times in UTC (PT)

21:20 (14:20) Take over for Nutsinee
21:25 (14:25) Jeff K. & Rich A. – Going into the CER to work on Binary IO for ITM ESD
21:55 (14:55) Jeff K & Rich A. – Going into LVEA to Beer Garden area
22:00 (15:00) Start initial alignment
22:00 (15:00) Kyle – Is out of the LVEA
22:01 (15:01) Dave & Jim – Going to End-Y CER
22:01 (15:01) Jeff K & Rich A. – Out of LVEA and back into CER
22:06 (15:06) Jeff K. & Rich A. – Out of the CER
22:50 (15:50) Jeff K. – Restarting BS model
23:00 (16:00) Turn over to Travis
 

End of Shift Summary:

Title: 06/07/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: Sheila
Incoming Operator: Travis 

Shift Detail Summary: Working on initial alignment with Sheila after end of maintenance window.   
Displaying report 1-1 of 1.