Report for 03 May 2012 The brushing was completed today using a total of 8 drills with 2 still running (again one of these is the fin and ring with flat brush drill). The upper chamber is almost done with 1st vacuuming. There is one nozzle opening left and then the bellows protection will come off and will need to be vacuumed.