(Corey, Eric, Jim)
Stage-0 Moved On To Test Stand
Positioned via threaded rods on Test Stand (we DID NOT put nuts on these). Dowel pins installed on Support Posts; still need to break tangs off of helicoils on Posts.
Stage-1 Moved On To Test Stand
Starting to helicoil it.
Prepping/Building Stage-1 Walls
These Walls need helicoils installed and dowel pins pressed.
Above, should state that the Stage-1 was moved on to the Assembly Stand.