Reports until 16:19, Friday 04 May 2012
X1 SEI
corey.gray@LIGO.ORG - posted 16:19, Friday 04 May 2012 - last comment - 08:34, Monday 07 May 2012(2765)
HAM ISI #6 Assembly Work

(Corey, Eric, Jim)

Stage-0 Moved On To Test Stand

Positioned via threaded rods on Test Stand (we DID NOT put nuts on these).  Dowel pins installed on Support Posts; still need to break tangs off of helicoils on Posts.

Stage-1 Moved On To Test Stand

Starting to helicoil it.

Prepping/Building Stage-1 Walls

These Walls need helicoils installed and dowel pins pressed.

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 08:34, Monday 07 May 2012 (2772)

Above, should state that the Stage-1 was moved on to the Assembly Stand.