I replaced the razor blade beam dump that was being used to dump the p-pol beam (rejected beam in the MCR path) with two steering mirrors and a Kentek Trap-it.
The p-pol beam will be a minimum of 1.2W at 50W input power, and about 0.8W at 30W input power.
Removed: IO_MCR_BD6 razor blade dump
Added: steering mirrors IO_MCR_M14 and IO_MCR_M15:
Added: IO_MCR_BD6 high-power beam dump
With this upgrade completed, I've modified the IOT2L layout drawing to include the new components, and updated the version to D1300357-v3.