Reports until 16:07, Thursday 16 June 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:07, Thursday 16 June 2016 (27787)
Shift Summary - Day
TITLE: 06/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY:
Locking to DC Readout in the morning was repeatable until just about the mdle of the day. The gain of the IMC was having trouble staying locked with a transition in LASER power. This was corrected by Sheila, Evan and Peter F. The second half of the day didn't see much past CARM-ON_TR.
LOG:

13:45 Chris/Bubba/Joe et al out at EX working on wind break wall. All day work. Using tractor outside a well.

15:54 Hanford Emergency EXERCISE take cover message for the 200 area.

16:04 Gerardo,Chandra and John out to MY to check on CP5

16:11 Christina to open exterior high-bay rollup door and move items woith forklift. Currently locked at DC Readout. No one seems to mind.

16:30 Lock Loss OMC M1 WD tripped

16:33 Hanford Emergency Exercise ended.

17:32 Gerardo back

17:33 John and Chandra headed out to Y arm to check on cryo pumps. No incursion into VEA as sensor correction is turned ON.

18:18 John and Chandra back

18:24 Initial alignment. IMC was having some trouble due to some LSC value gone awry; EX was lacking in robust alignment; Too much pitch in DRMI and PRMI

15:00 DAQ training