Displaying report 1-1 of 1.
Reports until 16:06, Friday 17 June 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:06, Friday 17 June 2016 (27814)
Shift Summary - Day
TITLE: 06/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY:
Not much locking today. IMC and OMC issues are the  predicate of the day. IMC alignment done and Input Align will be the first task for the incoming operator as there are currently no flashes in the X-Arm.
LOG:

15:00 Krishna out to EY to re center BRS. Also Chris went to EX to check on the wind screen construction; back inside 30 minutes.

16:30 Chandra at MX performing manual overfill of CP5. Wanred me about ensuing alarms.

16:45 Dave B called to ask me about the aforementioned alarms.

17:14 Schofield and co. into CER 

18:17 Sheila and Haocun out to ISCT1 to center POP wavefront sensor that is railing

18:27 Sheila and Haocun out.

20:19 Sheila out to LVEA to take some IMC measurements

20:21 Cheryl out to IOT2L

20:24 Karen to optics lab for cleaning

20:45 Karen out of the optics lab

21:05 Keita out to IMC area

21:12 Kyle into LVEA to retrieve a meter by HAM4

21:16 Keita back

21:17 Kyle out

21:26 Gerardo to MX

22:29 Cheryl/Haocun/Sheila back from aligning IMC WFS

22:40 Initial Alignment

Displaying report 1-1 of 1.