15:00 Krishna out to EY to re center BRS. Also Chris went to EX to check on the wind screen construction; back inside 30 minutes.
16:30 Chandra at MX performing manual overfill of CP5. Wanred me about ensuing alarms.
16:45 Dave B called to ask me about the aforementioned alarms.
17:14 Schofield and co. into CER
18:17 Sheila and Haocun out to ISCT1 to center POP wavefront sensor that is railing
18:27 Sheila and Haocun out.
20:19 Sheila out to LVEA to take some IMC measurements
20:21 Cheryl out to IOT2L
20:24 Karen to optics lab for cleaning
20:45 Karen out of the optics lab
21:05 Keita out to IMC area
21:12 Kyle into LVEA to retrieve a meter by HAM4
21:16 Keita back
21:17 Kyle out
21:26 Gerardo to MX
22:29 Cheryl/Haocun/Sheila back from aligning IMC WFS
22:40 Initial Alignment