HAM ISI #6 Assembly Work

(Corey, Eric, Jim)

A first for me was installing the Walls right on to Stage-1 (vs building the walls as Pitchfork/Boxwork assemblies).  It seemed to work pretty well (and no lugging of 90+lb parts!).

Pitchforks

These were mainly installed on Monday, but we still had to torque one of the Pitchforks (some of the bottom bolts weren't torqued due to interference).

Keel

Installed the Keel after the Pitchforks were installed.

Boxworks & Flexure Posts

Installed the Boxworks assemblies on Stage-1.  They are not torqued.  They have one rough pass of torquing the bottom ones though.  One Flexure Post assy (Corner 2) has been installed/torqued per assy procedure.