TITLE: 06/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
LOG:
-
14:20 - Chris S to EX to check on wind fence settings.
-
15:17 - GRB (We are locked at INCREASE POWER 23.2W)
-
15:40 - Christina opening up OSB receiving door.
-
17:04 - Kiwamu to LVEA to recenter TCS CO2 Y
-
17:05 - Keita to LVEA to check ISS connections
-
17:16 Keita out
-
17:17 - Kiwamu to LVEA to transition to laser HAZARD and then open up TCSY table.
-
17:28 - Fil and student to CER mezzanine
-
17:37 - Fil and student out
-
18:05 - Jeff B to EY receiving area
-
18:55 - Kiwamu and Nutsinee to LVEA to change TCS setting
-
19:00 - Christina OSB rollup door, then to MY
-
19:20 - Jeff B back
-
19:32 - Christina, Karen leaving MY
-
19:52 - Nutsinee to LVEA?
-
20:30 - Keita to LVEA to work on ISS
-
20:36 - Kiwamu and Nutsinee out for lunch
-
21:19 - Gerardo to MX
-
22:02 - Jeff B to MY
-
22:05 - Kiwamu and Nutsinee to LVEA
-
22:17 - Jeff B from MY to MX
-
22:19 - Lockloss (~15 hr lock)
-
22:26 - Gerardo to MY to overfill CP3
-
22:55 - Gerardo back