Maintenance Day Log:
-
14:45 - Cris S to EX wind fence work
-
14:56 - Jeff K starting charge measurements
-
14:57 - Jeff B out of PSL
-
15:25 - Joe to LVEA for battery charging
-
15:34 - Richard to LVEA coil driver reset in beir garten
-
15:35 - Gerardo to LVEA to pull cable from rack in west bay to top of HAM1
-
15:40 - Joe out
-
15:41 - Hugh to LVEA inventory control
-
15:57 - David M to LVEA to plave seismometers
-
16:00 - N2 delivery at gate
-
16:05 - Charge measurements done
-
16:09 - Hugh to EX for HEPI fluid checks
-
16:21 - Jeff K done with End Quad model restarts
-
16:25 - Karen to MY
-
16:29 - Vinny to LVEA to look at mike, not the person
-
16:32 - Richard to CER to break stuff
-
16:37 - Hugh from EX to EY HEPI
-
16:46 - Carl B to LVEA to measure PI ITMY
-
16:50 - Vinny out
-
17:02 - Karen from MY to EY
-
17:02 - Jeff B unloading from mech room
-
17:15 - Jeff B done
-
17:33 - Joe to LVEA to unplug chargers
-
17:41 - DAQ restart
-
17:45 - Cristina MX to EX
-
17:47 - Karen leaving EY
-
17:49 - Joe done
-
17:58 - ASC model restart
-
18:12 - Fil back from ends, to LVEA to take pictures
-
18:30 - Ed to CER to help Fil pull PUM chasis
-
18:33 - Jenne to LVEA to join David M
-
18:37 - Jeff K to LVEA to check on status of work
-
18:58 - Gerardo out
-
18:58 - Ed out
-
19:10 - Ed to LVEA replace PUM chasis
-
12:15 - TJ to LVEA to transition laser status
-
12:35 - LVEA Laser SAFE
-
Richard, Fil, Ed in and out and in and out to imvestigate noisy osems on ITMs, PRM, SR2
-
20:41 - NSF tour into LVEA
-
20:42 - Jeff K to EY to turn on ESD
-
21:40 - Tour out, David M out
Locking is now in progress, Bounce/roll modes are high and are being damping at the moment.