Quiet shift environmentally, and the entire shift was devoted to Commissioning work. Here are a few notes:
-
nds1 went down (Dave, Jim brought it back)
-
Always make sure the Down Script runs---> after a lockloss noticed that the X-arm was misaligned by alot (tracked down to ITMx pitch). Apparently, the DOWN script didn't clear the ITMx Pit M0 path. Running DOWN & INIT brought back ITMx.
-
Mysterious Arm dark offset zeroing was another oddity.