HAM ISI #6 & #7 Assembly Work

(corey, eric, jim, mitch)

HAMISI#6 Work

Optics Table Installation

Table installed with no issues (used [3] symmetrically-placed HAM lifting blocks & 3-leg sling).  The Table hung fairly level and this made it easy to drop it on Stage-1.  Here is some serial number info:

Springs S/Ns 

Flexure

HAMISI#7 Work

This is our first #7 item to work on in the Staging Building.  This table is sitting on the granite table and waiting for someone to helicoil it.