h1iscex lost timing
Jim, Dave:
at 09:41 PDT h1iscex lost its timing sync. Possibly due to a power cord being moved which drives the independent DC powered timing slave in the IO Chassis. Models were restarted at 11:50 PDT.
h1susetm and h1omcpi new models
Jeff, Carl, Dave
New h1susetm[x,y] and h1omcpi models were installed. DAQ was restarted
New Vacuum Controls code
Patrick, Dave
New Vacuum controls Beckhoff code was installed at all 7 locations. Required a DAQ restart.
alog tiny font fixed
an entry made this morning set the font size to x-small. This was fixed.
Ready to upgrade h1fw0 to 10 GigE if it becomes unstable WP5985
Jim, Dave
If h1fw0 becomes unstable, we will upgrade its CDS-LDAS link from 1GE to 10GE using borrowed LDAS cards. The next time it crashes it will not restart. We'll wait until 4pm PDT and then allow a restart.
will keep h1fw0 running overnight. the 4pm deadline passed, all daq systems have been running for 3 hours now. Reminder, difference now is that two 64kHz channels have been removed from the commissioning frame, six 512Hz channels added to science frame.