- Stop Work on ALS laser at EY during the morning due to confusion over access, SOPs, and the ODs of laser glasses. The Stop Work was lifted shortly afterwards. - Reminder: Stop Work orders and affairs relating to all personnel should be sent to the entire site mailing list (address withheld from aLOG), not just the staff mailing list. - For watchdogs, the ETMY SUS MEDM is incorrect. If the IOPDACKILL shows that damping is allowed, and the 10-minute bypass is started, it will show the IOPDACKILL tripping. Either one of these signals is incorrect. - Mid-Columbia Forklift replaced the tires on a forklift. - Dust counts in the bake oven lab were ~10,000 today for a considerable period of time. - Integration Meeting convened in the Control Room. - Hugh removed HAM2 ISI cover for pre-install testing. - PSL working on video cameras and other controls...Rick is looking for (aspiring) experts in laser power metrology and beam profiling. - ALS/TMS crew working with laser. They were also working in BSC6. - At ~3pm, an AC power cord was pulled at EY, cutting power to the timing fanout system at EY. Systems were restored afterwards. - SUS working inside of BSC8 in the afternoon. - OSB doors locked at 4:00pm.