Reports until 16:49, Monday 01 November 2010
H2 INS
keita.kawabe@LIGO.ORG - posted 16:49, Monday 01 November 2010 (282)
HAM6 lock down
Mike and I went to HAM6 to lock ISI/OMC down.

For OMC breadboard, all 14 EQ stops were engaged, though probably that was an overkill.

We decided to leave ISI locked down (no eddy current damping).
Images attached to this report