vernon.sandberg@LIGO.ORG - posted 08:15, Friday 08 July 2016 (28265)
State of the IFO over the night

Upon my arrival (at 7:45 am PT) in the control room I found the IFO locked and in "Observation" mode with the intent bit set.  The Lock Clock showed 8:50 hours and counting.  The input power was 24.3 W.  Camera images looked stable and as expected. (Because the video5 computer had frozen! argh).  DARM ASD looked terrible, but not unreasonable for the operating condition of the IFO.  ISC_Lock Guardian was in Nominal Low Noise.

This is a better start of the day then we have had for awhile. This should allow the ER9 testing of the hwinj, cal, and data pipelines and, with the intent bit set, allow the analysis streams to test their readiness.

15:13 UTC (8:13 PT) - just lost lock. Morning activities?