corey.gray@LIGO.ORG - posted 15:57, Friday 11 May 2012 (2828)
HAMISI #5 & #6 Work

(corey, eric, hugh)

HAMISI#5

Took some photos of the recently-received Horizontal GS13s.  These were placed on the #5 Optics Table, and Hugo ran some quick transfer functions to check their acceptance (heard they are good).  Attached two photos of the set up.

It was decided that the bad Horiz GS13s installed on #5 will be pulled and swapped with (3) Horiz we just received.  The three we pulled are== Horiz GS13s:  20, 37, 84.  They are bagged & tagged and ready to be sent to LLO.

REMEMBER:  we need to get Horiz Actuator & V1-GS13 serial numbers.  Also need to install Particle Fences (if possible).

HAMISI#6

Finished up some minor tasks on this guy (Pull Downs removed, Mid Flexure Doors installed, Particle Fences installed).

Images attached to this report